lessphp fatal error: failed to parse passed in variable @bodyBackground: lessphp fatal error: failed to parse passed in variable @bodyBackground: Testimonials | Aqualtra

Call Us: +1 972.971.9755

Testimonials

On behalf of the project's investor, I.H.Farm, and as the technical supervisor, we hereby confirm that G-servis Praha supplied and installed the technology for the reverse osmosis water treatment plant to lower the sulphate, iron, manganese, calcium and magnesium content in the water at the Oblík farm in Raná u Loun in 2013.

  • Budget: CZK 1,021,495 before VAT
  • Location: Raná u Loun, Czech Republic
  • Capacity: 1 cubic m/hr

Both the structural and the technology work has been carried out professionally and with due care.
Our cooperation and the quality of the supplied water treatment plant has been very satisfactory.

Ing. Josef Hrycyszyn, Managing Director,

We hereby confirm that G-servis Praha supplied the structure and technology for the reverse osmosis and ultra-filtration water treatment plant for LONZA BIOTECH in its Kouřim facility in 2012 - 2013.

  • Budget: CZK 5,970,000 before VAT
  • Location: Kouřim, Czech Republic
  • Capacity: 720 cubic m/day

Both the structural and the technology work has been carried out properly and professionally.
We see our cooperation and the quality of the supplied water treatment plant as very satisfactory.

Ing. Ladislav Kolek, Managing Director,

We would like to confirm that G-servis Praha supplied the technology for the water treatment plant within the cyanogen production facility at Lučební závody Draslovka in Kolín in 2012. The supply also included technical supervision and site supervision.

  • Budget: CZK 9,100,000 before VAT
  • Location: Kolín, Czech Republic
  • Capacity: 600 cubic m/day

Both the structural and the technology work has been carried out professionally and with due care.
We see our cooperation and the quality of the supplied water treatment plant as very satisfactory.

Ing. Martin Plšek, Member of the Board of Directors and CEO,

According to our common activities for water treatment systems on Chinese market and under your assistance, we assembled and installed in provinces Jiangsu and Shandong total 9 sets of Alpha water treatment units.

We can confirm that until today that the Alpha units are working properly without any technical and other problems for more than 5 years. We can confirm that these Alpha units due to simply operation are very suitable for areas where (there is a) short amount of the experts.

Usages for geology, civil defence and army, health industry, etc.

Wu Ya Dong, President,